BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ITE Canada - ECPv6.16.4//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:ITE Canada
X-ORIGINAL-URL:https://www.itecanada.org
X-WR-CALDESC:Events for ITE Canada
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Vancouver
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20200308T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20201101T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20210314T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20211107T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20220313T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20221106T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Vancouver:20210218T120000
DTEND;TZID=America/Vancouver:20210218T130000
DTSTAMP:20260626T180549
CREATED:20210112T035327Z
LAST-MODIFIED:20210113T210519Z
UID:10000410-1613649600-1613653200@www.itecanada.org
SUMMARY:GVITE Online Presentation: Alex Fraser Bridge Improvement Project
DESCRIPTION:About the Presentation: \nThe Alex Fraser Bridge Improvement Project is the most recent recipient of GVITE’s Bill Curtis Award for an outstanding transportation project. \nWith upwards of 120\,000 vehicles using the Alex Fraser Bridge daily\, congestion was a growing problem. Motorists were experiencing excessive delays and queues more than three kilometres long during rush hours. The BC Ministry of Transportation and Infrastructure’s Alex Fraser Bridge Improvement Project greatly improved conditions with the addition of a seventh lane\, an innovative movable barrier counter-flow system\, and 13 new dynamic message signs throughout the Lower Mainland. \nThe Project has resulted in approximately 20-minutes travel time savings during the southbound PM peak\, and approximately 10-minutes travel time savings during the northbound AM peak. \nBinnie/MOTI’s innovative design represents the first and only moveable barrier counter-flow system in western Canada. \n  \nAbout the Presenters: \nEdmund Lee\, P.Eng.\nTransportation Major Projects Division Manager\, Principal\nR.F. Binnie & Associates Ltd.\n\nEdmund Lee is a Division Manager at Binnie\, with 31 years of experience in the areas of roadway design\, traffic engineering\, and transportation planning. Edmund has specialized expertise in the areas of highway planning and highway conceptual\, preliminary and detailed designs\, through direct involvement in numerous major interchange/intersection and highway corridor projects throughout the Lower Mainland. \nSimon Church\, P.Eng.\nAssistant Project Manager\, Associate\nR.F. Binnie & Associates Ltd.\nSimon Church is a Project Engineer with Binnie’s Transportation Major Projects division. Simon has 10 years of experience working on large transportation projects in BC and Alberta\, primarily during the construction phase. For the last three years\, Simon has acted as Deputy Engineering Manager for the HWY 91/17 Upgrade Project.\n\n\nRegister by the website link below
URL:https://www.itecanada.org/event/gvite-online-presentation-alex-fraser-bridge-improvement-project/
LOCATION:Greater Vancouver (Virtual)\, Vancouver\, BC\, Canada
CATEGORIES:Presentation,Webinar
GEO:49.282803889907;-123.12768196781
END:VEVENT
END:VCALENDAR